Features#
Here is a list of changes made to this repository specifically for WattTime Impact Metastudy, with the potential to be upstreamed to the main PyPSA-Eur repository.
Baseline Enhancements
Cherry-picked storage features and technologies from Form Energy Storage Project (open-energy-transition/procurement-metastudy#2)
Added global and national renewable energy share targets (open-energy-transition/procurement-metastudy#11)
Implemented coal phase-out through
powerplants_filter
(open-energy-transition/procurement-metastudy#15)Added
res_additionallity
(open-energy-transition/procurement-metastudy#16)Improved retrieving of CI load input data (open-energy-transition/procurement-metastudy#17)
Added national renewable capacity targets (open-energy-transition/procurement-metastudy#18)
Established a standardized background scenario prior to implementing procurement strategies (open-energy-transition/procurement-metastudy#22)
Added the impact of electricity imports from neighboring buses into the grid quality score (open-energy-transition/procurement-metastudy#23)
Set capacities based on the TYNDP transmission grid (open-energy-transition/procurement-metastudy#24)
Added
freeze_capacity
option to represent system conditions in 2025 (open-energy-transition/procurement-metastudy#27)Added a new constraint called
import_constraints
(open-energy-transition/procurement-metastudy#30)Centralized all CI-related processes under a new Snakemake rule named
add_procurement
(open-energy-transition/procurement-metastudy#31)Added a new procurement scope:
continent
(open-energy-transition/procurement-metastudy#34)Added
cap_premium
to support optimal spatial allocation of CI procurement technologies (open-energy-transition/procurement-metastudy#36)
Procurement Strategy Development
Added annual volume matching strategy (open-energy-transition/procurement-metastudy#8)
Added 24/7 carbon-free energy strategy (open-energy-transition/procurement-metastudy#9)
Added mmission-matching constraint and retrieve CI load share from Eurostat (open-energy-transition/procurement-metastudy#12)
Improved emission_matching_constraints and refactored the CI load workflow (open-energy-transition/procurement-metastudy#26)
Model Usability Improvements
Developed the first command-line interface for running the model (open-energy-transition/procurement-metastudy#25)
Added user documentation via GitHub Pages (open-energy-transition/procurement-metastudy#37)
Bug Fixes
Fixed issues with emissionality signal handling (open-energy-transition/procurement-metastudy#28)
Removed requirement for specifying a procurement year in
extra_functionality
(open-energy-transition/procurement-metastudy#29)Corrected configuration loading to enable procurement via
config
instead ofparams
(open-energy-transition/procurement-metastudy#33)Addressed final scenario preparation bug (open-energy-transition/procurement-metastudy#35)