Data sources

DemandCast retrieves hourly electricity demand from 47 data sources. This page lists each one and explains the YAML file that describes it.

Files of a data source

Each source is two files in demandcast/retrievals/electricity_demand_data_sources/:

  • <source>.py: the module that downloads the data and returns the demand in MW. Its docstring gives the format, time zone, quirks and left-out areas of the data.
  • <source>.yaml: the licence, what the demand counts, and the countries and subdivisions with their dates.

The file name without .yaml, such as entsoe, is the value of electricity_data_source in retrieve.py.

The YAML file

Field What it gives
licence redistribute (whether the terms allow sharing the data), terms (a summary) and url. DemandCast publishes only its models and forecasts, not the retrieved data.
definition What the demand counts, as periods in order of start_date. See The definition of a data source.
compiled true for a compiled data source, which republishes the data of system operators, such as the EIA. Default false.
republishes For a compiled source, the compiled sources it also republishes, such as entsoe for the IEA.
entities The countries and subdivisions, with the fields below.
Entity field Meaning
country_name, country_code The country and its ISO 3166 alpha-3 code.
subdivision_name, subdivision_code, time_zone For a subdivision only, all three. Its code is <country_code>_<subdivision_code>, such as USA_CAL.
start_date, end_date First and last days of the data. end_date: today means five days ago.
same_area false if the data covers only part of the shape of the code. Default true.

The processed data of an entity keeps only the days between its start_date and end_date, in local time. So a country can have its own data only until the data of its subdivisions starts, as Argentina does until 2026-02-16.

The file is checked when read. An unknown field, a subdivision without all three of its fields, an unknown time zone, a start_date after end_date, a code listed twice, periods of definition out of order, or republishes without compiled: true is an error.

The combination ranks the sources of a code with definition, compiled, republishes and same_area: see Combination.

The table

  • Covers: the codes in the YAML file.
  • Years: first and last years in the YAML file.
  • Resolution: the time step, from the module docstring.
  • Embedded generation: the embedded_generation value of each period of definition (see embedded generation).
  • Needs: the variables to set in demandcast/.env (see API keys and accounts), or the start of the names of the files that you download by hand into electricity_demand/raw/manual_downloads/.
Source Provider Covers Years Resolution Embedded generation Needs Notes
adme Administrador del Mercado Eléctrico (Uruguay) URY 2019–today 1 h unknown – Generation plus imports minus exports.
aemo_nem Australian Energy Market Operator, National Electricity Market 5 subdivisions of AUS 1998–today 30 min; 5 min from Oct 2021 excluded; added from 2017-01-01 – Adds AEMO's rooftop solar estimate. A month waits for its archive file.
aemo_wem Australian Energy Market Operator, Wholesale Electricity Market AUS_SWIS 2006–today 30 min; 5 min from Oct 2023 excluded; added from 2020-11-03 – Adds AEMO's distributed solar estimate.
aeso Alberta Electric System Operator CAN_AB-AIES 2001–2025 1 h included – Alberta Internal Load; also supplies Fort Nelson, BC.
bchydro BC Hydro CAN_BC-INTEGRATED 2001–today 1 h unknown – Without Fort Nelson and off-grid areas.
caiso California ISO USA_CAISO 2019–today 1 h excluded – About 82% of the EIA region USA_CAL.
cammesa CAMMESA (Argentina) 22 provinces of ARG 2026–today 5 min unknown – The API keeps only the last 7 to 8 months; the raw data keeps the rest.
ccei Canadian Centre for Energy Information 8 subdivisions of CAN 2002–today various unknown – Compiled. Corrects wrong times of some provinces; no BC or Saskatchewan.
cen Coordinador Eléctrico Nacional (Chile) CHL_SEN 2016–2026 1 h unknown – No data after 2026-05-13.
cenace Centro Nacional de Control de Energía (Mexico) 9 subdivisions of MEX 2016–today 1 h excluded – Until 2019, each area gives its generation minus its exports.
cnd Centro Nacional de Despacho (Panama), on Mendeley Data PAN_SIN 2016–2020 1 h unknown – One file.
coes Comité de Operación Económica (Peru) PER_SEIN-2000, PER_SEIN 2000–today 30 min unknown – One entity per area of the grid, before and from 2011.
edf_sei EDF Systèmes Énergétiques Insulaires (Corsica) FRA_20R 2019–2024 1 h unknown – Generation plus imports; years after 2020 are estimates.
egat Electricity Generating Authority of Thailand, on Zenodo THA 2023–2024 1 h unknown – Sum of five regions.
eia US Energy Information Administration 13 regions of USA 2020–today 1 h excluded EIA_API_KEY Compiled. Corrects the one-hour delay of CAISO in USA_CAL (2022-06-16 to 2025-12-02).
ema Energy Market Authority (Singapore) SGP 2014–today 30 min included – Weekly files: several years take up to 10 minutes.
emi Electricity Market Information (New Zealand) NZL 2005–2020 30 min unknown – From 2020-12-22 the IEA gives the two islands.
entsoe European Network of Transmission System Operators for Electricity 30 countries and 9 subdivisions (38 countries in all) 2014–today 15 min to 1 h unknown ENTSOE_API_KEY Compiled. Corrects wrong times of Bulgaria, Northern Ireland and Ukraine.
epias EPIAS transparency platform (Turkey) TUR 2015–today 1 h added; included from 2020-12-30 EPIAS_USERNAME, EPIAS_PASSWORD Adds licence-exempt generation until 2020-12-29.
eskom Eskom (South Africa) ZAF 2021–today 1 h excluded Files ESK* (CSV) Ask for the data with the form of the Eskom data portal; a link arrives by email.
grupoice Grupo ICE (Costa Rica) CRI 2012–today 15 min unknown –
hydroquebec Hydro-Québec CAN_QC-INTEGRATED 2019–2025 1 h unknown – Real-time values; a year is added months after it ends.
iea International Energy Agency, Real-Time Electricity Tracker 45 countries and 94 subdivisions (70 countries in all) 2009–today 1 h unknown – Compiled; republishes ccei, eia, entsoe and occto. Times corrected per country.
ieso Independent Electricity System Operator (Ontario) CAN_ON 1994–today 1 h excluded – Times in Eastern Standard Time all year.
ismo Independent System and Market Operator (Pakistan) PAK_NTDC 2024–2025 1 h excluded – One fiscal year, July 2024 to June 2025; without K-Electric.
isone ISO New England USA_NE 2019–today 1 h added ISONE_USERNAME, ISONE_PASSWORD Native load plus ISO-NE's estimate of the solar behind the meters.
kansaitd Kansai Transmission and Distribution (Japan) JPN_Kansai 2016–today 1 h; 30 min from Mar 2024 partial – OCCTO republishes the same demand.
korem Kazakhstan Operator of Electricity and Capacity Market KAZ_NORTH-SOUTH, KAZ_WEST 2023–today 1 h unknown – Monthly files listed by hand in the module: add each new one there.
krogd Korean Open Government Data portal (data of KPX) KOR 2013–2025 1 h excluded – Stops with an error when the portal asks for a CAPTCHA.
nbpower NB Power (New Brunswick) CAN_NB 2019–today 1 h unknown – The current month is not in the archive yet.
nea Nepal Electricity Authority, on Open Data Nepal NPL_INPS 2017–2018 1 h, some 30 min unknown – One year of the Bikram Sambat calendar.
neso National Energy System Operator (Great Britain) GBR_GB 2001–today 30 min excluded; added from 2007-10-28 – Adds NESO's embedded wind and solar estimate.
ngcp National Grid Corporation of the Philippines 7 grids of PHL 2013–2025 1 h unknown – One Excel file, one sheet per grid.
niti NITI Aayog, India Climate and Energy Dashboard 32 subdivisions of IND 2017–2026 1 h excluded Files NIT* (Excel) Download a year and two states at a time, behind a reCAPTCHA.
ntdc National Transmission & Despatch Company (Pakistan), Zenodo copy PAK_NTDC 2015–2020 1 h excluded – Corrects the dates around midnight and the hours that slip in 2019.
occto Organization for Cross-regional Coordination of Transmission Operators (Japan) 10 areas of JPN 2016–today 1 h partial – Compiled.
oluwole_et_al Oluwole et al., on Mendeley Data (Nigeria) NGA 2016 1 h unknown – Modelled demand without load shedding, not measured.
ons Operador Nacional do Sistema Elétrico (Brazil) 9 subdivisions of BRA 2000–today 1 h excluded; included from 2023-04-29 – One entity per area of the North and South-East subsystems.
pgcb Power Grid Bangladesh BGD 2014–today 1 h excluded – One report a day: all the data takes a few hours.
pucsl Public Utilities Commission of Sri Lanka LKA 2023–today 15 min excluded; included from 2025-07-11 – Sum of the dispatch of the plants; up to an hour for all data.
so_ups System Operator of the Unified Energy System of Russia 7 subdivisions of RUS 2001–today 1 h unknown – One request a day, at least 3 seconds apart: slow.
sonelgaz Sonelgaz (Algeria), on Mendeley Data DZA_RIN 2008–2020 1 h unknown – Values divided by 125/148 to get MW.
taipower Taipower (Taiwan), on Zenodo TWN 2017–2022 10 min unknown – Sum of four areas.
tepco Tokyo Electric Power Company JPN_Kantō 2016–2026 1 h partial – The website refuses its monthly files (from 2025) outside Japan since 2026-10-22; OCCTO gives the same demand.
tsoc Transmission System Operator of Cyprus CYP 2018–today 15 min included – Only years that have ended; corrects shifted times.
wu_et_al Wu and Kan, on Zenodo (China) 31 provinces of CHN 2018 1 h unknown – Modelled load: each day has the shape of a typical day.
xm XM (Colombia) COL_SIN 2000–today 1 h unknown – Through a proxy, about 25 seconds a month.

The status page gives the numbers of countries, subdivisions and years of all the sources.

Add a data source

  1. Add the source to the Awesome Electricity Demand list first.
  2. Write <source>.py, with get_available_requests(code, start_date, end_date) and download_and_extract_data_for_request(request, code), and <source>.yaml without comments. ons.py and hydroquebec.py are good templates.
  3. Add a test with a small synthetic fixture of the source's files.
  4. Check it over the network with the live check, and run the related entities check for its codes.

The contributing guide is the reference for the module interface and the YAML fields.