Pakistan

Silver atlas: the small-installation estimate is not yet checked by people. Installations of about 400 m² (70 kWp) and up are validated against hand-mapped ground truth. The estimate below that is calibrated on areas mapped panel by panel, but nobody has yet checked the classifier's results on cells drawn at random or building by building, so read Best as an estimate still to be confirmed.

You can help: map every panel inside a calibration area. Sparsely built areas help most: the estimate there rests on the fewest mapped areas.

Contribute data: map a calibration area → In the browser (iD) With JOSM