Solar thermal power plants

Status: shipped 2026-11-07

Evidence atlases count concentrated solar power (CSP) plants mapped in OpenStreetMap in their Best estimate and their Verified floor, at their electric rating, and keep solar thermal out of every photovoltaic figure. Every published country has been checked except France and Germany (see the table at the end).

OpenStreetMap tags solar thermal installations with the same generator:source=solar (or plant:source=solar) as photovoltaic ones. Two kinds matter here: concentrated solar power plants, mirror fields that focus sunlight to drive a steam turbine, and solar water heaters, collectors on roofs that heat water. Neither is photovoltaic. Counted as PV, a mirror field adds capacity that does not exist (South Africa's Khi Solar One covers 5.97 km², which the ground-mount land constant of 0.05 kWp per m² would read as 298 MWp against its 50 MW), and as training labels it teaches the model that mirrors are panels.

Since October 2026 solar thermal has been taken out of each new country's labels (scripts/drop_solar_thermal.py). Since 7 November 2026 the atlas also counts the CSP plants themselves, in every country, as a component of their own.

What counts

A plant counts when OpenStreetMap maps it as a power=plant whose plant:method names thermal (never photovoltaic: a hybrid outline is part PV and stays with PV) and which carries a plant:output:electricity tag. A thermal plant with only a hot-water or heat output is a heating plant (solar district heating, common in Germany and Poland) and does not count, nor do solar water heaters: the atlas measures electricity. A plant lying mostly inside another plant's outline is a part of it (Solaben 2 inside the Solaben complex) and counts once, through the larger outline. A few plants carry no thermal tag at all and are named in drop_solar_thermal.KNOWN_THERMAL on documentary evidence (Parque solar Alvarado II in Spain, whose English name says "Solar Thermal Power Plant").

What is solar thermal at all, for removal from the PV side, is wider: any element whose method names thermal, whose generator:type is a CSP collector type or solar_thermal_collector (added 7 November 2026: Spain had 161 collector rows typed that way with no method tag, 156 of them inside Alvarado II), and any feature lying at least half inside a CSP plant's outline whatever its tags. The last rule exists because mappers often draw a plant's mirror rows with the photovoltaic preset: all seven South African plants carry such rows, 50 of them covering 13.4 km², which the published page counted as about 670 MWp of ground-mount PV.

Capacity

The plant's own plant:output:electricity where it gives a number. Where it does not (a bare yes), or where the number is implausibly high for the site, capacity is the site area times 27.2 MW per km², the median of the 46 plants of at least 0.2 km² that carried an MW tag in South Africa, Morocco, Spain and Turkey (10-90%: 18.9-42.8 MW per km²). "Implausibly high" means more than three times that density on a site of at least 0.5 km², which is what a tag naming a whole complex looks like: Noor 3's outline is tagged 582 MW, the total of Noor 1 to 4, and the site rule gives it 158.6 MW against its rated 150. Only high tags are overruled: tower plants are legitimately sparse (Khi Solar One 8.4 MW per km², Gemasolar 10.4).

In the atlas

The plants join the hand-mapped population after its dissolve, as ground rows priced at their rating instead of an area constant. They are always counted from the map: no satellite detection stands in for a mirror field, and they never enter the absorption of mapped misses into the satellite total. So they are in Verified and in Best, in the map's OSM-mapped view and in the province figures, and they have:

  • a tile, Solar thermal power (CSP), OpenStreetMap, MW, where the country has any, so the tiles still add up to Best;
  • a map quantity of their own in Show;
  • a row in the composition bar and in the uncertainty plot;
  • a step in How the estimate is built.

A tagged plant is its nameplate and carries no error of its own. Plants priced from site area share one lognormal draw with the measured spread (log-SD 0.41), which, like the kWp constants, is the same draw in every country. A page whose country was never checked says so (totals.csp_status.checked: false) rather than showing zero.

Best and Verified are otherwise photovoltaic module capacity in MWp; the CSP plants add their electric rating in MW, and the page says so wherever it shows them.

Running it

scripts/solar_thermal_plants.py --aoi <aoi> --osm-solar <the atlas's OSM file> [--candidates <candidates.parquet>] does it for one country: it drops solar thermal from the OSM file the atlas counts (rewritten in place, the original kept beside it), writes data/labels/<aoi>_csp_plants.parquet (even when empty), removes model candidates at least half inside a solar thermal outline, and writes its reports to results/solar_thermal/. The atlas reads the table by itself. A changed candidate file means density must run again before the atlas. run_country_compute.sh runs it after the national OSM file is built.

Per country

Checked 7 November 2026. Removed from PV is what left the OSM file the atlas counts; candidates are model outlines removed because they lay on a solar thermal outline.

Country CSP plants MW Removed from PV Candidates Page
Spain 43 2,383.0 1,409 label features (281 PV-tagged inside plants) 11 built with them: Verified 39,379.3; Best 41,776.7
South Africa 7 600.0 50 PV-tagged mirror rows, 13.4 km² 0 Verified 9,393.8 to 9,322.7; Best 9,910.2 to 9,839.0
Morocco 3 518.6 none (filtered in October) 0 Verified 380.4 to 898.9; Best 416.5 to 935.1
India 4 197.9 30 outlines, 9.1 km² 5 Verified 70,523.4 to 70,266.0; Best 103,036.9 to 102,779.7
Turkey 1 5.8 none 0 Verified 10,709.1 to 10,714.9; Best 17,592.6 to 17,598.4
Poland 0 0 14 collectors, 0.003 km² 0 Verified 6,604.3 to 6,604.1; Best 9,110.3 to 9,110.2
Egypt, Pakistan, Namibia, Zambia, Nigeria, Yemen, Vietnam 0 0 none 0 unchanged, page not rebuilt
France, Germany not checked yet (scan stopped 7 November)

Spain's MW is 2,243 from tags and 140 from site area (Helios, tagged only yes, reads 65 MW against its 2 x 50 MW). Plants left out as heating plants: four in Spain (among them the Plataforma Solar de Almería research site), the NISE campus at Gwal Pahari in India, two solar district heating plants in Poland's area (Senftenberg among them, tagged plant:output:electricity=no) and one unnamed plant in Turkey.