Spain: parks mapped one by one, and 324 km² of outlines still to judge¶
Spain was added on the owner's request on 2 November 2026, under the same rules as every
country since the Morocco-Egypt-Yemen-South Africa queue: no calibration quadrats, no register
used, the segmentation localized on Spain's own OpenStreetMap labels and shipped only if it
beats the general model on a held-out region. It does, clearly, and this page runs on
v26_combined_spain. Spain's ground-mounted fleet is unusually well mapped, so Verified is
already most of Best.
Interactive: Spain under Countries. The map opens on the peninsula and the Balearics; the Canaries are on it too, a pan to the south-west, and in every figure.
Headline¶
| Verified | 39,379.3 MWp (90% 28,162 to 55,883) |
| Best estimate | 41,776.7 MWp (90% 37,232 to 56,235) |
| Generation at Best | 65.0 TWh a year (90% 57.9 to 87.5), at a PVGIS yield of 1,556 kWh/kWp |
| Grid | 5,712 imaged cells of 0.1°, of the 5,752 that cover the country; 17 regions (geoBoundaries) |
| Imagery | Sentinel-2 L2A, May to September 2026; median scene 2 August, middle half 7 July to 2 September |
| Model | v26_combined_spain epoch 21, localized (beat v5_combined_france on the held-out region; see below) |
Both tiers include Spain's 43 concentrated solar power plants, 2,383 MW at their electric rating (solar thermal power plants). Without them Verified is 36,996 MWp and Best 39,394 MWp of photovoltaics.
A floor below 400 m², and very large outlines not yet judged
Spain has no calibration quadrats, so there is no roofclf half and no instrument
below the 400 m² segmentation floor, where household and most commercial rooftop
systems sit: the page's rooftop figure is 254 MWp. It has no glint sample, so p_unmapped
is 0 and p_real collapses to the OpenStreetMap-mapped fraction, and recall was deliberately
skipped (--recall-reference none), so the model's figures are a precision floor.
998 model outlines above 100,000 m² (324.4 km²) wait for a person's verdict and
count for nothing until then (below). At the land constant they would be 16,220 MWp if
every one were solar; in the countries judged so far the solar share of outlines has run
from none (Namibia) to 87% (India). On open ground most of what the model adds is not
solar (below).
For comparison, Red Eléctrica reports almost 50 GW of solar PV at the end of 2025 (33.1% of a 150.8 GW mix), self-consumption included; UNEF, the industry association, puts self-consumption at 9.3 GW that same date. 59,329 MWp of panels were imported directly from China from January 2017 to August 2026 (Ember). None of these is ground truth for the map. REE's regional notes do not give a capacity total for the largest PV regions and its data API returned errors on 8 November, so the page draws no regional comparison.
Two things specific to Spain¶
The building footprints have holes. VIDA is the footprint source everywhere else, but in
Spain 3,022 of the 5,803 cells touching the country were empty and 9 of 21 city centres tested
held no building at all, Seville, Valencia and Málaga among them; the Canaries are fine, the
mainland is Microsoft-only with block-shaped gaps. scripts/fill_vida_from_osm.py keeps every
VIDA row and adds OpenStreetMap buildings only in 0.01° blocks holding no VIDA footprint:
2.99 million buildings added, 9.37 million in all, and cells with any footprint up from 2,781 to
5,709. OpenStreetMap is itself incomplete in places, so rooftop and ground placement is less
even here than the map suggests.
A wider net. The standing rule images cells with at least 1,000 buildings plus every cell holding mapped solar. On the owner's decision Spain images every cell with at least one building (5,712 cells rather than about 1,900), because the unmapped parks of a ground-mount country sit on thinly built land.
Localizing the detector¶
Labels. 78,421 OpenStreetMap solar features inside the bounding box after the solar-thermal filter (3,317 plant outlines and 75,104 generators, 9,000 of them nodes). The generator polygons are small, median 135 m², and two mappers last edited most of the features. The filter's last pass removed 1,409 features, among them Alvarado II and 281 PV-tagged rows inside thermal plants. Dissolved, the country holds 4,081 installations of 400 m² and up.
Holdout. Picked from the label map by scripts/pick_val_region.py before training:
Castilla-La Mancha, 824 cells, with 664 of the 4,081 (16.3%). Castilla y León, with 809, is the
largest region and never the holdout. 1,028 val chips, and a one-cell buffer took 139 chips out
of training.
Corpus and recipe. 5,956 Spanish chips (3,856 with PV), 4,789 of them train, at weight 1,
joined to v5's corpus (Germany, Punjab, Pakistan, Gujarat, France) for 31,194 chips; the recipe
is v5's verbatim. Training took just under four hours on the GTX 1060 and stopped after epoch
29 with its best at epoch 21. scripts/pick_checkpoint_by_recall.py then scored eleven epoch
snapshots and the best-and-last average against that checkpoint at its own precision: none
reached it, so epoch 21 stands, at the threshold of 0.3.
The ship decision, scripts/compare_local_vs_v5.py on the 1,028 held-out chips, both models
at pixel precision 0.84 (v5 never reaches the localized model's own precision, so they meet at
v5's best, the localized model at 0.3 and v5 at 0.98):
| v5 | v26 (localized) | |
|---|---|---|
| recall, installations at or above 500 m² | 0.787 (7,557 of 9,604) | 0.863 (8,290) |
| pixel IoU | 0.546 | 0.712 |
By size, with both models at 0.3, where v5's precision is lower (0.814): 1,000 m² and up 0.577 against 0.749; 500 to 1,000 m² 0.879 against 0.909; 250 to 500 m², not decisive, 0.978 against 0.981. The recall gap, 0.076, is well outside the 0.02 tie band.
The ground-perimeter screen¶
All 2,253 mapped ground perimeters of 50,000 m² and up (844.4 km²) are at least 90% imaged, 2,204 of them at least 98%, and the median one is 96% detected; 399 are under half detected. Eight exceed the 5 km² cap (60.8 km²). All eight are imaged whole and at least 82% detected, so they are kept as parks.
Plausibility gate¶
earthpv check-density fails 13 of the 17 regions and marks the other 4 suspect. Every
failure is the ground-mount to rooftop ratio of the model's estimate (62 MWp rooftop against
13,612 MWp ground): the missing rooftop denominator of every segmentation-only country, on top
of a fleet that really is mostly ground-mounted. Región de Murcia also fails single-cell
concentration: one cell holds 29% of the region and a mapped 8.5 km² park sits in it.
Published as for every segmentation-only country: stated, not waived.
Greenhouses do not read as panels¶
Almería's and Murcia's plastic greenhouses are bright, regular sheets, a plausible
false-positive class, so this was measured before the page was shown
(scripts/spain_greenhouse_check.py). The five main districts hold 422 of the model's unmapped
outlines and 68.5 of the 3,126.4 MWp priced on such outlines nationally (2.2%), which is a
ceiling on any confusion because real parks count too. The Campo de Dalías, Spain's largest
greenhouse district, holds 22 outlines and 2.2 MWp.
| District | Outlines | km² | Priced (MWp) | Review outlines |
|---|---|---|---|---|
| Campo de Dalías | 22 | 0.25 | 2.2 | 0 |
| Níjar | 27 | 1.46 | 3.4 | 1 |
| Campo de Cartagena | 134 | 7.87 | 26.1 | 7 |
| Águilas and Mazarrón | 65 | 1.32 | 11.2 | 2 |
| Huelva coast | 174 | 8.69 | 25.5 | 18 |
Each district's three highest-priced outlines below the merge cap were looked at on Esri World Imagery (a quick look by the assistant, on the sheet the script draws). Of the 15, nine are solar, two of those on roofs, and none is a greenhouse; the others are a truck park, a quarry, a dry gully, a field among greenhouses, forest and an evaporation pond.
Footprints are another matter: greenhouses are traced as buildings. Asked for the most large-roof area in the densest quarter, the sampler for start-here calibration boxes chose two windows wholly under plastic in the Campo de Dalías (below).
What the model adds beyond the map¶
Best exceeds Verified by 2,397.4 MWp: 53.4 on rooftops and 2,344.0 on the ground, spread over 3,165 cells, the largest adding 10.5 MWp. By region Castilla y León adds 775.3, Andalucía 379.2, Castilla-La Mancha 373.2, Extremadura 167.2 and Aragón 134.4.
The two largest unmapped outlines below the merge cap in each of the ten cells adding most were looked at on Esri World Imagery (a quick look, not a review). Of 20, three are solar parks (two near 4.4° W, 42.6° N in Palencia, one in the Campo de Cartagena), one is unclear, and 16 are not: bare rock outcrops in the woodlands of Cáceres and Toledo and in the Pyrenees, arable fields in Palencia and around Seville, and quarries. Esri's capture dates are not all known, so a park built on a field since then would be missed; rock does not change.
They reach Best through the precision table. With no glint sample, p_real is the mapped
fraction of each size bin, and Spain's many mapped parks make that high for large ground
outlines: 39.2% above 50,000 m² and 8.0% from 5,000 to 50,000 m². Every unmapped
outline of that size is priced at that share of its area, rock or not. The page says so in
its caveats; no filter removes these outlines yet. Verified, which counts only mapped
installations, is not affected.
Candidate population¶
27,703 candidates: 2,601 rooftop, 3,477 ground-adjacent, 21,625 with no building, median
6,601 m². 1,883 carry a mapped OpenStreetMap geometry. 2,049 exceed the 100,000 m²
merge cap: 701 of them mapped (513.4 km²) and exempt, and 1,348 model-drawn outlines
(496.0 km², the largest 5.6 km², 35.8% of all candidate area) excluded from capacity.
Of those, 1,109 lie more than 100 m from any mapped solar feature, and 998 pass the lead screens
and are in the solar farm review (data/oversize_review/spain/index.html). Nobody has judged
them yet.
The model's own estimate is 13,741.6 MWp (est_mwp_rc), 13,674.7 of it ground. Without a
recall reference it equals the precision-weighted est_mwp_cal.
Verified is the hand-mapped layer at the two constants, plus the thermal plants. 19,428 reference features after dissolving, 4,083 of them 400 m² and up: 36,795.8 MWp of ground, 200.5 of rooftop and 2,383.0 of solar thermal. 7,505 of them are matched by a candidate. Best is floored at Verified in 964 cells.
| Region | Verified (MWp) | Best (MWp) | of which solar thermal (MW) |
|---|---|---|---|
| Extremadura | 10,919.5 | 11,086.7 | 1,009.9 |
| Castilla-La Mancha | 8,114.2 | 8,487.4 | 315.2 |
| Andalucía | 7,677.1 | 8,056.3 | 960.0 |
| Castilla y León | 4,169.7 | 4,945.0 | 0 |
| Aragón | 4,296.4 | 4,430.8 | 0 |
| Región de Murcia | 1,960.3 | 2,000.4 | 30.0 |
| Comunidad Foral de Navarra | 586.3 | 616.7 | 0 |
| Cataluña | 369.4 | 490.8 | 18.1 |
| Comunitat Valenciana | 343.6 | 445.3 | 49.8 |
| La Rioja | 323.9 | 347.1 | 0 |
| Illes Balears | 253.6 | 269.9 | 0 |
| Comunidad de Madrid | 137.9 | 195.3 | 0 |
| Canarias | 128.2 | 134.0 | 0 |
| Galicia | 15.8 | 69.9 | 0 |
| Principado de Asturias | 12.4 | 48.1 | 0 |
| País Vasco | 19.2 | 33.9 | 0 |
| Cantabria | 4.0 | 13.6 | 0 |
Mapping leads and calibration areas¶
11,929 mapping leads and 998 very large outlines, the model's outlines more than 100 m from
any solar feature in OpenStreetMap as of 2 November 2026, are in the release
pv-new-leads-2026-11-02
(spain_pv_new_leads.geojson, most promising first, and spain_pv_blob_leads.geojson, largest
first), and the atlas links them. The usual screens took out 1,872 small outlines on ground
steeper than 15° and 10,038 open-ground outlines whose peak probability stays below 0.9;
3,282 larger outlines on steep ground are kept and marked steep_review. The surface-water
screen is off for Spain. Check every lead against recent imagery before mapping it: on open
ground most are the rock and fields above.
Eighteen calibration candidates, none mapped yet, all with Esri imagery from May 2025 or later at their centre and corners:
- eight 2 km boxes drawn at random across eight bands of building density, from Zaragoza to Valencia;
- two purposive 1 km start-here boxes, the most large-roof area in the densest quarter: Vigo's car plant, the atlas's starred area, and a dense neighbourhood of Palma. The rule first chose two windows of plastic greenhouses in Almería and then central Madrid, whose blocks are traced as single large buildings, so those districts were left out by hand, as each box's selection note records;
- eight 3 km farm boxes across bands of cropland share, from Lleida to Cuenca, for small arrays beside fields.
Six to ten complete areas would start a small-installation half for Spain.
Operational notes¶
The queue pulled the labels on 2 and 3 November and composed 5,712 cells, paused three times on
the owner's request and slowed by disk and network limits, done on 7 November. With Spain given
the GPU first (scripts/gpu_priority.py), training took four hours and inference over the 5,712
cells another four, and everything from postprocessing to the first atlas two more. The solar
farm review's first draw died on a timed-out elevation download, and being non-fatal it left its
marker behind; it was redrawn the same morning.
What Spain needs next¶
Judge the 998 very large outlines at data/oversize_review/spain/index.html. This is the
largest open quantity on the page, and the cheapest to settle.
Map the leads, starting with the parks the model already outlines in Palencia and the Campo de Cartagena.
A filter for bare rock and arable land. Hard negatives on rock outcrops and fields, or pricing low-confidence open-ground outlines apart, before the model's ground figure can be read as solar.
Calibration areas, mapped panel by panel, to start a small-installation half below 400 m², where almost all of the 9.3 GW of self-consumption sits.
A regional register. REE publishes installed capacity by autonomous community through its data service; once that answers, the page can draw the regions beside the atlas.
Reproducing¶
pixi run python scripts/overpass_labels_chunked.py --bbox=-18.2,27.6,4.4,43.9 \
--iso3 ESP --name spain --tiles 12x9 --timeout 300 --retries 8
systemd-run --user --collect --unit=earthpv-spain-queue -p WorkingDirectory="$PWD" \
-p LimitNOFILE=65536:65536 -p MemoryMax=4G --setenv=QUEUE_ONLY=spain \
bash scripts/run_country_queue.sh
The queue pulls the labels, runs the solar-thermal filter, composes Spain, picks the holdout and
hands the country to scripts/run_country_compute.sh spain (chips, training, the v5 comparison,
inference and the atlas chain, behind marker files).