Spain: parks mapped one by one, and 324 km² of outlines still to judge

Spain was added on the owner's request on 2 November 2026, under the same rules as every country since the Morocco-Egypt-Yemen-South Africa queue: no calibration quadrats, no register used, the segmentation localized on Spain's own OpenStreetMap labels and shipped only if it beats the general model on a held-out region. It does, clearly, and this page runs on v26_combined_spain. Spain's ground-mounted fleet is unusually well mapped, so Verified is already most of Best.

Interactive: Spain under Countries. The map opens on the peninsula and the Balearics; the Canaries are on it too, a pan to the south-west, and in every figure.

Headline

Verified 39,379.3 MWp (90% 28,162 to 55,883)
Best estimate 41,776.7 MWp (90% 37,232 to 56,235)
Generation at Best 65.0 TWh a year (90% 57.9 to 87.5), at a PVGIS yield of 1,556 kWh/kWp
Grid 5,712 imaged cells of 0.1°, of the 5,752 that cover the country; 17 regions (geoBoundaries)
Imagery Sentinel-2 L2A, May to September 2026; median scene 2 August, middle half 7 July to 2 September
Model v26_combined_spain epoch 21, localized (beat v5_combined_france on the held-out region; see below)

Both tiers include Spain's 43 concentrated solar power plants, 2,383 MW at their electric rating (solar thermal power plants). Without them Verified is 36,996 MWp and Best 39,394 MWp of photovoltaics.

A floor below 400 m², and very large outlines not yet judged

Spain has no calibration quadrats, so there is no roofclf half and no instrument below the 400 m² segmentation floor, where household and most commercial rooftop systems sit: the page's rooftop figure is 254 MWp. It has no glint sample, so p_unmapped is 0 and p_real collapses to the OpenStreetMap-mapped fraction, and recall was deliberately skipped (--recall-reference none), so the model's figures are a precision floor. 998 model outlines above 100,000 m² (324.4 km²) wait for a person's verdict and count for nothing until then (below). At the land constant they would be 16,220 MWp if every one were solar; in the countries judged so far the solar share of outlines has run from none (Namibia) to 87% (India). On open ground most of what the model adds is not solar (below).

For comparison, Red Eléctrica reports almost 50 GW of solar PV at the end of 2025 (33.1% of a 150.8 GW mix), self-consumption included; UNEF, the industry association, puts self-consumption at 9.3 GW that same date. 59,329 MWp of panels were imported directly from China from January 2017 to August 2026 (Ember). None of these is ground truth for the map. REE's regional notes do not give a capacity total for the largest PV regions and its data API returned errors on 8 November, so the page draws no regional comparison.

Two things specific to Spain

The building footprints have holes. VIDA is the footprint source everywhere else, but in Spain 3,022 of the 5,803 cells touching the country were empty and 9 of 21 city centres tested held no building at all, Seville, Valencia and Málaga among them; the Canaries are fine, the mainland is Microsoft-only with block-shaped gaps. scripts/fill_vida_from_osm.py keeps every VIDA row and adds OpenStreetMap buildings only in 0.01° blocks holding no VIDA footprint: 2.99 million buildings added, 9.37 million in all, and cells with any footprint up from 2,781 to 5,709. OpenStreetMap is itself incomplete in places, so rooftop and ground placement is less even here than the map suggests.

A wider net. The standing rule images cells with at least 1,000 buildings plus every cell holding mapped solar. On the owner's decision Spain images every cell with at least one building (5,712 cells rather than about 1,900), because the unmapped parks of a ground-mount country sit on thinly built land.

Localizing the detector

Labels. 78,421 OpenStreetMap solar features inside the bounding box after the solar-thermal filter (3,317 plant outlines and 75,104 generators, 9,000 of them nodes). The generator polygons are small, median 135 m², and two mappers last edited most of the features. The filter's last pass removed 1,409 features, among them Alvarado II and 281 PV-tagged rows inside thermal plants. Dissolved, the country holds 4,081 installations of 400 m² and up.

Holdout. Picked from the label map by scripts/pick_val_region.py before training: Castilla-La Mancha, 824 cells, with 664 of the 4,081 (16.3%). Castilla y León, with 809, is the largest region and never the holdout. 1,028 val chips, and a one-cell buffer took 139 chips out of training.

Corpus and recipe. 5,956 Spanish chips (3,856 with PV), 4,789 of them train, at weight 1, joined to v5's corpus (Germany, Punjab, Pakistan, Gujarat, France) for 31,194 chips; the recipe is v5's verbatim. Training took just under four hours on the GTX 1060 and stopped after epoch 29 with its best at epoch 21. scripts/pick_checkpoint_by_recall.py then scored eleven epoch snapshots and the best-and-last average against that checkpoint at its own precision: none reached it, so epoch 21 stands, at the threshold of 0.3.

The ship decision, scripts/compare_local_vs_v5.py on the 1,028 held-out chips, both models at pixel precision 0.84 (v5 never reaches the localized model's own precision, so they meet at v5's best, the localized model at 0.3 and v5 at 0.98):

v5 v26 (localized)
recall, installations at or above 500 m² 0.787 (7,557 of 9,604) 0.863 (8,290)
pixel IoU 0.546 0.712

By size, with both models at 0.3, where v5's precision is lower (0.814): 1,000 m² and up 0.577 against 0.749; 500 to 1,000 m² 0.879 against 0.909; 250 to 500 m², not decisive, 0.978 against 0.981. The recall gap, 0.076, is well outside the 0.02 tie band.

The ground-perimeter screen

All 2,253 mapped ground perimeters of 50,000 m² and up (844.4 km²) are at least 90% imaged, 2,204 of them at least 98%, and the median one is 96% detected; 399 are under half detected. Eight exceed the 5 km² cap (60.8 km²). All eight are imaged whole and at least 82% detected, so they are kept as parks.

Plausibility gate

earthpv check-density fails 13 of the 17 regions and marks the other 4 suspect. Every failure is the ground-mount to rooftop ratio of the model's estimate (62 MWp rooftop against 13,612 MWp ground): the missing rooftop denominator of every segmentation-only country, on top of a fleet that really is mostly ground-mounted. Región de Murcia also fails single-cell concentration: one cell holds 29% of the region and a mapped 8.5 km² park sits in it. Published as for every segmentation-only country: stated, not waived.

Greenhouses do not read as panels

Almería's and Murcia's plastic greenhouses are bright, regular sheets, a plausible false-positive class, so this was measured before the page was shown (scripts/spain_greenhouse_check.py). The five main districts hold 422 of the model's unmapped outlines and 68.5 of the 3,126.4 MWp priced on such outlines nationally (2.2%), which is a ceiling on any confusion because real parks count too. The Campo de Dalías, Spain's largest greenhouse district, holds 22 outlines and 2.2 MWp.

District Outlines km² Priced (MWp) Review outlines
Campo de Dalías 22 0.25 2.2 0
Níjar 27 1.46 3.4 1
Campo de Cartagena 134 7.87 26.1 7
Águilas and Mazarrón 65 1.32 11.2 2
Huelva coast 174 8.69 25.5 18

Each district's three highest-priced outlines below the merge cap were looked at on Esri World Imagery (a quick look by the assistant, on the sheet the script draws). Of the 15, nine are solar, two of those on roofs, and none is a greenhouse; the others are a truck park, a quarry, a dry gully, a field among greenhouses, forest and an evaporation pond.

Footprints are another matter: greenhouses are traced as buildings. Asked for the most large-roof area in the densest quarter, the sampler for start-here calibration boxes chose two windows wholly under plastic in the Campo de Dalías (below).

What the model adds beyond the map

Best exceeds Verified by 2,397.4 MWp: 53.4 on rooftops and 2,344.0 on the ground, spread over 3,165 cells, the largest adding 10.5 MWp. By region Castilla y León adds 775.3, Andalucía 379.2, Castilla-La Mancha 373.2, Extremadura 167.2 and Aragón 134.4.

The two largest unmapped outlines below the merge cap in each of the ten cells adding most were looked at on Esri World Imagery (a quick look, not a review). Of 20, three are solar parks (two near 4.4° W, 42.6° N in Palencia, one in the Campo de Cartagena), one is unclear, and 16 are not: bare rock outcrops in the woodlands of Cáceres and Toledo and in the Pyrenees, arable fields in Palencia and around Seville, and quarries. Esri's capture dates are not all known, so a park built on a field since then would be missed; rock does not change.

They reach Best through the precision table. With no glint sample, p_real is the mapped fraction of each size bin, and Spain's many mapped parks make that high for large ground outlines: 39.2% above 50,000 m² and 8.0% from 5,000 to 50,000 m². Every unmapped outline of that size is priced at that share of its area, rock or not. The page says so in its caveats; no filter removes these outlines yet. Verified, which counts only mapped installations, is not affected.

Candidate population

27,703 candidates: 2,601 rooftop, 3,477 ground-adjacent, 21,625 with no building, median 6,601 m². 1,883 carry a mapped OpenStreetMap geometry. 2,049 exceed the 100,000 m² merge cap: 701 of them mapped (513.4 km²) and exempt, and 1,348 model-drawn outlines (496.0 km², the largest 5.6 km², 35.8% of all candidate area) excluded from capacity. Of those, 1,109 lie more than 100 m from any mapped solar feature, and 998 pass the lead screens and are in the solar farm review (data/oversize_review/spain/index.html). Nobody has judged them yet.

The model's own estimate is 13,741.6 MWp (est_mwp_rc), 13,674.7 of it ground. Without a recall reference it equals the precision-weighted est_mwp_cal.

Verified is the hand-mapped layer at the two constants, plus the thermal plants. 19,428 reference features after dissolving, 4,083 of them 400 m² and up: 36,795.8 MWp of ground, 200.5 of rooftop and 2,383.0 of solar thermal. 7,505 of them are matched by a candidate. Best is floored at Verified in 964 cells.

Region Verified (MWp) Best (MWp) of which solar thermal (MW)
Extremadura 10,919.5 11,086.7 1,009.9
Castilla-La Mancha 8,114.2 8,487.4 315.2
Andalucía 7,677.1 8,056.3 960.0
Castilla y León 4,169.7 4,945.0 0
Aragón 4,296.4 4,430.8 0
Región de Murcia 1,960.3 2,000.4 30.0
Comunidad Foral de Navarra 586.3 616.7 0
Cataluña 369.4 490.8 18.1
Comunitat Valenciana 343.6 445.3 49.8
La Rioja 323.9 347.1 0
Illes Balears 253.6 269.9 0
Comunidad de Madrid 137.9 195.3 0
Canarias 128.2 134.0 0
Galicia 15.8 69.9 0
Principado de Asturias 12.4 48.1 0
País Vasco 19.2 33.9 0
Cantabria 4.0 13.6 0

Mapping leads and calibration areas

11,929 mapping leads and 998 very large outlines, the model's outlines more than 100 m from any solar feature in OpenStreetMap as of 2 November 2026, are in the release pv-new-leads-2026-11-02 (spain_pv_new_leads.geojson, most promising first, and spain_pv_blob_leads.geojson, largest first), and the atlas links them. The usual screens took out 1,872 small outlines on ground steeper than 15° and 10,038 open-ground outlines whose peak probability stays below 0.9; 3,282 larger outlines on steep ground are kept and marked steep_review. The surface-water screen is off for Spain. Check every lead against recent imagery before mapping it: on open ground most are the rock and fields above.

Eighteen calibration candidates, none mapped yet, all with Esri imagery from May 2025 or later at their centre and corners:

  • eight 2 km boxes drawn at random across eight bands of building density, from Zaragoza to Valencia;
  • two purposive 1 km start-here boxes, the most large-roof area in the densest quarter: Vigo's car plant, the atlas's starred area, and a dense neighbourhood of Palma. The rule first chose two windows of plastic greenhouses in Almería and then central Madrid, whose blocks are traced as single large buildings, so those districts were left out by hand, as each box's selection note records;
  • eight 3 km farm boxes across bands of cropland share, from Lleida to Cuenca, for small arrays beside fields.

Six to ten complete areas would start a small-installation half for Spain.

Operational notes

The queue pulled the labels on 2 and 3 November and composed 5,712 cells, paused three times on the owner's request and slowed by disk and network limits, done on 7 November. With Spain given the GPU first (scripts/gpu_priority.py), training took four hours and inference over the 5,712 cells another four, and everything from postprocessing to the first atlas two more. The solar farm review's first draw died on a timed-out elevation download, and being non-fatal it left its marker behind; it was redrawn the same morning.

What Spain needs next

Judge the 998 very large outlines at data/oversize_review/spain/index.html. This is the largest open quantity on the page, and the cheapest to settle.

Map the leads, starting with the parks the model already outlines in Palencia and the Campo de Cartagena.

A filter for bare rock and arable land. Hard negatives on rock outcrops and fields, or pricing low-confidence open-ground outlines apart, before the model's ground figure can be read as solar.

Calibration areas, mapped panel by panel, to start a small-installation half below 400 m², where almost all of the 9.3 GW of self-consumption sits.

A regional register. REE publishes installed capacity by autonomous community through its data service; once that answers, the page can draw the regions beside the atlas.

Reproducing

pixi run python scripts/overpass_labels_chunked.py --bbox=-18.2,27.6,4.4,43.9 \
  --iso3 ESP --name spain --tiles 12x9 --timeout 300 --retries 8
systemd-run --user --collect --unit=earthpv-spain-queue -p WorkingDirectory="$PWD" \
  -p LimitNOFILE=65536:65536 -p MemoryMax=4G --setenv=QUEUE_ONLY=spain \
  bash scripts/run_country_queue.sh

The queue pulls the labels, runs the solar-thermal filter, composes Spain, picks the holdout and hands the country to scripts/run_country_compute.sh spain (chips, training, the v5 comparison, inference and the atlas chain, behind marker files).