Skip to content

Belgium: the larger arrays only, against a fleet that is mostly small

Belgium was added on the owner's request on 7 November 2026 with Portugal, the Netherlands, Luxembourg and Italy, under the rules every recent country follows: no calibration quadrats, no register used, the segmentation localized on Belgium's own OpenStreetMap labels and shipped only if it beats the general model on a held-out region. It does, narrowly and on a thin holdout, and this page runs on v31_combined_belgium.

Interactive: Belgium PV evidence atlas.

Headline

Verified 502.3 MWp (90% 413 to 629)
Best estimate 970.8 MWp (90% 860 to 1,127)
Grid 423 cells of 0.1°, 3 regions (geoBoundaries)
Imagery Sentinel-2 L2A, May to September 2026, median scene 1 July
Model v31_combined_belgium epoch 22, localized (see below)

Revised on 10 November: large installations judged

Until 10 November this page read Best 639.3 MWp (90% 557 to 774). On 10 November the owner judged, on the large installation review, every unmapped model outline from 1 ha up to the 10 ha merge cap that the lead screens keep: 224 of the 252 judged are solar, the other 28 are not. Most are on roofs, where the size class had put the chance of solar near 4%. These leads counted before at the share their size class usually turns out real; now a lead judged solar counts as real (a roof outline at ½.5 of its area, since the model draws about 2.5 times the array) and one judged not solar counts nothing. Best rises by 331.5 MWp; Verified did not move.

A precision floor, and blind to most of Belgium's solar

Belgium has no calibration quadrats, so there is no roofclf half and no instrument below the 400 m² segmentation floor, and recall was deliberately not corrected (--recall-reference none). Elia, the transmission system operator, monitored 12,128 MW of solar on 30 September 2026 (ods032), so Best is about 8% of the fleet. Read this page as a map of the larger arrays and of what is mapped, not as an estimate of Belgian solar. Panels imported directly from China, 25.4 GW from January 2017 to August 2026 (Ember), are about twice the installed fleet, so they are a very loose ceiling here.

Against Elia, by region

Region Verified (MWp) Best (MWp) Elia monitored (MW) Best as a share of Elia
Vlaams Gewest 218.3 511.5 8,713.8 5.9%
Wallonne Gewest 248.5 354.9 3,083.1 11.5%
Brussels Hoofdstedelijk 26.8 44.0 331.4 13.3%
Belgium 502.3 970.8 12,128.3 8.0%

The regions sum to 493.6 MWp Verified and 910.4 MWp Best; the rest of the national totals lies in border cells outside the three regions. Elia's dataset gives monitored capacity in MW and does not say whether that is panel (DC) or inverter (AC) capacity. None of these figures is ground truth for this map.

Localizing the detector

The holdout is the Brussels-Capital Region: 2 cells, 4.8% of the country's positive chips, 171 mapped installations of 500 m² and up. It is one dense city, so it says little about the rest of the country.

Compared at equal pixel precision (0.268) Local v31 epoch 22 General v5
Recall, installations of 500 m² and up 0.795 0.801
Pixel IoU 0.275 0.240
Pixel F1 0.448 0.370

Recall ties (a difference of 0.006), so the owner's rule goes to pixel IoU, where the local model wins by 0.035. It ships at threshold 0.3, where on the same holdout its pixel precision is 0.320, pixel IoU 0.288 and recall at 500 m² and up 0.760.

Plausibility gate

earthpv check-density compares each region's ground-mounted capacity with its rooftop capacity. It fails Wallonia and flags Flanders:

Region Rooftop (MWp) Ground (MWp) Ratio Status
Wallonne Gewest 13.7 83.8 6.10 fail
Vlaams Gewest 30.8 97.4 3.17 suspect
Brussels Hoofdstedelijk 2.5 0.8 0.31 ok

The same pattern as Poland and Spain: household rooftops are below what the sensor resolves, so the rooftop denominator is small. Whether the model's ground outlines are themselves right has not been checked by eye in Belgium.

What is counted

  • OpenStreetMap: 25,054 reference features inside the border after the solar thermal filter, placed as 22,549 rooftop, 1,703 ground and 802 unknown. Verified is all mapped capacity.
  • Model: 1,440 candidates. Best adds 137.0 MWp over Verified. Four outlines above the 100,000 m² merge cap (3.8% of candidate area, the largest 0.24 km²) are excluded from capacity until judged; 15 OSM-verified oversize candidates are exempt.
  • Border cells are kept whole: 158 priced candidates (58.8 MWp recall-corrected) lie beyond the border in cells the page keeps whole, and its total counts them. A combined atlas does not.
  • Solar thermal: no concentrated solar plant. Four thermal plants make no electricity and do not count.
  • Footprints: VIDA, with 27,636 OSM buildings filling 710 empty 0.01° blocks (0.6% of 4.58 million).

Operational notes

An internet outage on 9 November (02:48 to 05:01 and 06:32 to 08:29) hit several steps of the chain. The density, plausibility, OSM solar, solar thermal and atlas steps and the imagery dates were re-run afterwards; the totals did not change, and the district layer and the solar thermal check now exist. Two steps have not been redone: export skipped its steep-ground lead screen, and the solar farm review package was not drawn.

What Belgium needs next

A rooftop instrument. An area mapped panel by panel would start a small-installation half. No regional installation records have been looked at for this page.

The steps still owed. Re-run export for the steep-ground screen, draw the solar farm review for the four oversize outlines, publish the mapping leads, and propose calibration areas.

Reproducing

Belgium follows Scale to a new country, with the AOI in configs/aoi.yaml and the model in configs/terramind_pv_v31_belgium.yaml. The last step:

pixi run earthpv atlas --aoi belgium \
  --osm-solar data/labels/belgium_national_osm_solar.parquet --include-offgrid-osm \
  --imagery-date-range "May - Sep 2026" --out results/belgium_pv_evidence_atlas.html