Pakistan capacity by installation size

The capacity map reports the evidence atlas's Best-estimate total per 0.1° grid cell. This page reports the same total a different way: by installation size, split rooftop vs ground-mount, instead of by geography. It is not a second estimate -- every MWp here comes from the identical components and calibration the main atlas uses, re-binned rather than recomputed. The two pages' totals match for the same run to within 0.02% (currently 24,330.0 vs 24,333 MWp) -- the residual is a handful of candidates whose location falls just outside every grid cell's polygon and so never enters a per-cell total on either page, not an uncounted source of error.

Open the size-distribution chart (interactive; hover a bar for its exact value and installation count). The geographic view of the same total is the Pakistan PV Atlas.

Why size, not just geography

A 0.1° cell can hold a handful of household rooftops and a utility-scale plant at once, and the map has no way to tell them apart -- both just add MWp to the same cell. Splitting by installation size instead answers a different question: how much of the national total is small, distributed rooftop capacity that would need millions of individual net-metering connections to interconnect, versus how much is a handful of large, grid-connector-scale sites. The shape is stark: rooftop dominates every bin below 20,000 m², and ground-mount dominates the largest bin outright (utility plants like Quaid-e-Azam Solar Park), with almost nothing rooftop at that scale.

Where each bin's capacity comes from

Five populations, identical to the capacity map's own "Two tiers, one country" breakdown, each re-binned by its own real size field instead of collapsed into one national number:

  • Ground-mount, every bin -- segmentation candidates, no domain restriction. roofclf has no building footprint to score a free-standing array against, so this is segmentation's own instrument at every scale it detects.
  • Rooftop, ≥400 m² -- roofclf's own building-level estimate inside the density-matched domain, segmentation's recall-corrected candidates outside it. A building is counted by exactly one of the two per cell, never both.
  • Rooftop, <400 m² -- roofclf alone inside the density-matched domain. The roofclf-AND-SPPI agreement outside that domain was dropped from both this page and the main atlas on 2026-08-15 (it was the one component not measured where it was applied); passing --sub400-outdomain-cells still restores it, as a marked extrapolation drawn as a hatched slice on the 100–400 m² rooftop bar.
  • Hand-mapped OpenStreetMap, unmatched by the model -- sized by each installation's own real geodesic area, split rooftop/ground-mount by its mapped placement tag.

One more population feeds this page without ever appearing as its own bin: the AND-gate (roofclf-and-SPPI-agreeing) sub-400 m² population inside the domain. It never contributes to Best estimate directly, but the main atlas floors Best at what a person has actually mapped plus that stricter population, per cell -- a matched OpenStreetMap installation's own bin-averaged precision/recall correction can undershoot its true mapped area (Quaid-e-Azam Solar Park is the standing example). Skipping that floor here would have silently undercounted this page's total against the published one by about 4.5% in the cells holding the country's largest matched ground-mount plants -- caught exactly because the two totals are required to match, not assumed to.

What this page does not show

It carries no credible interval of its own. The main atlas's 90% range applies to the same total shown here; read the two pages together, not as competing figures. See Capacity density for the full derivation of every component and Capacity map for the geographic view and its own uncertainty composition.

Reproducing this page

Needs the same inputs as the evidence atlas (see Capacity map), plus this run's own candidates.parquet:

pixi run earthpv atlas-by-size --aoi pakistan \
    --osm-solar data/labels/pakistan_overpass_solar.parquet \
    --sub400-low-cells       data/roofclf_national_with_sppi/pakistan/density/sub400_low_incremental_buildings.parquet \
    --sub400-central-cells   data/roofclf_national_with_sppi/pakistan/density/sub400_central_incremental_buildings.parquet \
    --ge400-roof-cells       data/roofclf_national_with_sppi/pakistan/density/ge400_roof_incremental_buildings.parquet \
    --out docs/assets/interactive/pakistan_size_distribution_atlas.html

--sub400-low-cells is required even though the AND-gate population is never shown -- see "Where each bin's capacity comes from" above. Run earthpv atlas for the geographic view first (or afterward) so the two pages describe the same underlying run.