Skip to content

Denmark: the solar parks, and little else

Denmark was added on the owner's request on 8 November 2026, after Italy, under the rules every recent country follows: no calibration quadrats, no register used, the segmentation localized on Denmark's own OpenStreetMap labels and shipped only if it beats the general model on a held-out region. It does, on a small holdout. Since 19 November 2026 this page runs on v37r_resnet50_denmark, a ResNet-50 localized the same way, which found more of the held-out installations than the TerraMind v37_combined_denmark it replaced (below).

Interactive: Denmark under Countries.

Headline

Verified 2,639.9 MWp (90% 1,853 to 3,797)
Best estimate 2,683.1 MWp (90% 2,236 to 3,950)
Generation 2.9 TWh/yr from Best (90% 2.4 to 4.3), 1,093 kWh/kWp
Grid 704 imaged cells of 0.1°, of the 720 that cover the country; 5 regions (geoBoundaries ADM1)
Imagery Sentinel-2 L2A, May to September 2026, median scene 9 July
Model v37r_resnet50_denmark epoch 10 at threshold 0.95, a localized ResNet-50 (see below)

A map of the parks, blind to Denmark's rooftops

Denmark has no calibration quadrats, so there is no roofclf half and no instrument below the 400 m² segmentation floor, and recall was not corrected (--recall-reference none). The Danish Energy Agency registers 5,468 MW of grid-connected solar on 30 September 2026, the last day of the imagery window (Solcelleudbygningen i Danmark pr. 3. kvartal 2026), so Best is about 49% of the fleet. 3,164 MW of the register is 83 plants with neither subsidy nor self-consumption, which is where Denmark's parks are, and 238 MW more is 48 tendered plants; the rest is some 175,000 mostly small systems. Best is 2,628 MWp ground and 55 MWp rooftop, so read it as a map of the parks and of what is mapped. Panels imported directly from China, 4.35 GW from January 2017 to August 2026 (Ember), are a quarter below the registered fleet: much of Denmark's supply comes through other EU countries, so the page does not call that a ceiling.

The agency's quarterly note gives no regional figures, so the page compares the national total only. It gives MW without saying whether that is panel (DC) or inverter (AC) capacity. None of these figures is ground truth for this map.

Localizing the detector

The holdout is Nordjylland: 111 cells, 58 of the country's 476 dissolved positives of 400 m² and up (12.2%), chosen by pick_val_region.py from the label map before training; the largest region, Syddanmark, is never the holdout. pick_checkpoint_by_recall.py chose epoch 28 at threshold 0.95.

Compared at equal pixel precision (0.89) Local v37 epoch 28 General v5
Recall, installations of 500 m² and up (of 98) 0.531 0.459
of 1,000 m² and up (of 71) 0.732 0.620
of 500 to 1,000 m² (of 27) 0.000 0.037
Pixel IoU 0.793 0.768
Pixel F1 0.880 0.862

The local model finds 52 of the 98 held-out installations against 45, all of its gain among arrays of 1,000 m² and up. At the strict thresholds both need to reach this precision neither finds arrays below 1,000 m² in Nordjylland, and a holdout of 98 installations cannot separate the two models by much.

The localized ResNet (v37r), 2026-11-19

v37r_resnet50_denmark is the released v28's model, a ResNet-50 pretrained on SSL4EO-S12, trained on v37's corpus with v37's recipe, so the architecture is the only difference (scripts/run_resnet_local.sh, configs/terramind_pv_v37r_resnet50_denmark.yaml). Epoch 10 was kept. On the same Nordjylland holdout, at the threshold both ship at:

At threshold 0.95 ResNet v37r TerraMind v37
Pixel precision 0.927 0.894
Pixel recall 0.903 0.876
Mapped arrays of 400 m² and up found (of 120) 77 52
rooftop, 400 to 5,000 m² (of 24) 17 2
ground, 400 m² and up (of 96) 60 50

It finds 26 arrays the TerraMind misses and misses 1 it finds (results/fair_score/resnet_local/denmark/). Against the general v5 at v5's best pixel precision, 0.90, it finds 59 of the 98 installations of 500 m² and up against 44, pixel IoU 0.835 against 0.768, so it passes the same rule v37 did (results/denmark_checkpoint_decision.json). The owner moved the page to it on 19 November 2026. Nationally it draws 1,305 outlines against 543; the calibration table prices its size bins lower, so Best moved from 2,695.1 to 2,683.1 MWp, and Verified, which is the map, did not move. No outline of the TerraMind run had been judged, so no verdict was carried over.

Plausibility gate

earthpv check-density compares each region's ground-mounted capacity with its rooftop capacity. Four fail and one is suspect:

Region Rooftop (MWp) Ground (MWp) Ratio Status
Syddanmark 2.26 728.5 322.5 fail
Sjælland 1.04 276.8 266.6 fail
Midtjylland 2.57 640.0 249.0 fail
Nordjylland 0.88 198.2 225.8 fail
Hovedstaden 0.88 21.0 23.8 suspect

The same pattern as Belgium and the Netherlands: the model sees almost no rooftop arrays, so the denominator is tiny. One cell in Syddanmark also holds 25% of that region's model capacity. Whether the model's ground outlines are themselves right has not been checked by eye in Denmark.

Solar heating fields

Denmark has more large solar thermal collector fields, feeding district heating, than any other country, and from orbit they look like solar parks. The OSM scan found 684 solar thermal elements; the 54 model outlines lying at least half inside one of the 674 mapped thermal polygons (2.32 km²) were dropped before pricing. A heating field nobody has mapped stays in, counted as photovoltaics. One plant named a solar heating plant, Høng solvarmeanlæg, carries plant:output:electricity=yes, so the page counts it as a solar thermal power plant of 1.7 MW priced from its 0.06 km² site; it is probably mis-tagged. Twelve thermal plants without electric output are not counted.

What is counted

  • OpenStreetMap: 3,875 reference features inside the border, placed as 2,093 rooftop, 1,728 ground and 54 unknown; 606 of them are 400 m² and up and hold 2,605.3 MWp. Verified is all mapped capacity.
  • Model: 1,251 candidates after the solar heating filter. Best adds only 43.2 MWp over Verified: in 181 cells the model's priced figure fell below the mapped capacity and Best is floored at Verified. 14 outlines above the 100,000 m² merge cap (16.2% of candidate area, the largest 2.39 km²) are excluded from capacity; 75 OSM-verified oversize candidates (37.60 km²) are exempt. 80 priced candidates, 12.3 MWp, lie beyond the border in cells kept whole.
  • Waiting for a person: 58 leads from 1 ha up to the cap (1.0 km²) on the large installation review, none judged yet. The solar farm review is empty: of the 14 outlines above the cap, 12 lie within 100 m of mapped solar and 2 outside the country's regions (at sea or across the border).
  • Footprints: VIDA, with 158,905 OSM buildings filling 3,881 empty 0.01° blocks (4.2% of 3,739,916).

What Denmark needs next

A rooftop instrument. Areas mapped panel by panel would start a small-installation half; some 175,000 registered systems are below what the model sees.

The review. 58 large leads wait on the large installation review.

The steps still owed. Look at a sample of the model's unmapped ground outlines on high-resolution imagery for heating fields, publish the mapping leads, and propose calibration areas.

Reproducing

Denmark follows Scale to a new country, with the AOI in configs/aoi.yaml and the model in configs/terramind_pv_v37r_resnet50_denmark.yaml (the TerraMind it replaced: configs/terramind_pv_v37_denmark.yaml). The run is in data/predictions_resnet_20261119/ (release_leads.py SOURCES). The last step:

pixi run earthpv atlas --aoi denmark --pred-dir data/predictions_resnet_20261119 \
  --osm-solar data/labels/denmark_national_osm_solar.parquet --include-offgrid-osm \
  --imagery-date-range "May - Sep 2026" --out results/denmark_pv_evidence_atlas.html