California: the solar parks, mapped and priced by area

California was added on the owner's request on 10 November 2026, with Texas and Mexico, and is the second state run as an AOI of its own (division.subtype: region): its regions are its counties, and the hand-mapped solar is clipped to the state's own outline rather than the country's, which keeps the parks around Las Vegas, inside California's bounding box, off the page. Otherwise it follows the rules every recent country follows: no calibration quadrats, no register used to calibrate, the segmentation localized on California's own OpenStreetMap labels and shipped only if it beats the general model on a held-out region. It wins, and this page runs on v38_combined_california.

Interactive: California under Countries.

Headline

Verified 27,118.1 MWp (90% 19,382 to 38,488)
Best estimate 32,198.9 MWp (90% 26,394 to 42,625)
Generation 59.9 TWh/yr from Best (90% 49.1 to 79.3), 1,861 kWh/kWp
Grid 1,405 imaged cells of 0.1°, of the 4,203 that cover the state; 57 of its 58 counties hold an imaged cell (not Alpine)
Imagery Sentinel-2 L2A, May to September 2026, median scene 29 July
Model v38_combined_california, the average of epochs 32 and 40, at threshold 0.95, localized (see below)

A map of the parks, in panel capacity

California has no calibration quadrats, so there is no roofclf half and no instrument below the 400 m² segmentation floor, and recall was not corrected (--recall-reference none). Best is 31,147.0 MWp ground (concentrated solar power included) and 1,051.9 MWp rooftop, 883.6 MWp of it hand-mapped: the small-scale systems the U.S. Energy Information Administration estimates at 21,240.1 MW, close to half of the state's solar, are almost all missing. EIA counts 46,334.9 MW of solar power in California at the end of August 2026: 24,177.0 MW of utility-scale PV, 917.8 MW of solar thermal and those small-scale systems (Electric Power Monthly, table 6.2.B). Its generator inventory lists 25,621.3 MW of utility-scale solar (PV and thermal) at the end of September (EIA-860M). Those are inverter (AC) figures; this page counts panels (DC), and where EIA-860M reports both, California's PV plants carry 1.275 times as much panel as inverter capacity (941 of 984 plants), about 32 GW DC for the utility-scale fleet. Best is 69% of EIA's total and about the size of the utility-scale fleet in DC terms (0.99).

The page compares the state total with both EIA figures, and the counties with EIA-860M's utility-scale plants summed by county (44 counties; EIA writes one Kern County row as KERN, matched to Kern). Over those 44 counties Best and EIA rank the counties at Spearman 0.89. Best is 0.6 to 1.8 times EIA's AC figure in the ten counties with the most capacity: high in San Luis Obispo (1.78), Kern (1.47), Kings (1.42) and Los Angeles (1.30), low in the desert counties, Imperial (0.61), San Bernardino (0.75) and Riverside (0.85, up from 0.57 with the 26.1 km² of Riverside parks judged on 18 November, below). None of these figures is ground truth for this map. Ember's customs data are national, so this page has no import ceiling.

Localizing the detector

The holdout is Santa Clara County: 22 cells, 615 of the state's 6,014 positives (10.2%), chosen by pick_val_region.py from the label map before training; the largest county, Los Angeles, is never the holdout. Santa Clara is mostly built-up, so it tests rooftop arrays more than parks. pick_checkpoint_by_recall.py chose the average of the val/mIoU pick (epoch 32) and the last epoch (40), at threshold 0.95: installation recall of 400 m² and up 0.589 against epoch 32's 0.507 on the half it chose on, 0.475 against 0.450 on the half that confirmed it, at epoch 32's pixel precision.

Compared at equal pixel precision (0.55) Local v38 average General v5
Recall, installations of 500 m² and up (of 1,254) 0.554 0.499
of 1,000 m² and up (of 370) 0.568 0.578
of 500 to 1,000 m² (of 884) 0.536 0.517
Pixel IoU 0.339 0.274
Pixel F1 0.504 0.444

v5 never reaches the local model's precision, so both are compared at v5's best (0.553, v5 at 0.98, the local model at 0.1). The local model finds 695 against 626 installations, a margin beyond the tie band, and ships at its own threshold, 0.95. That threshold is the matched one, and for an averaged checkpoint a matched threshold this high can lose arrays over whole cells (the averaging note in CLAUDE.md); the published page uses it as chosen.

A localized ResNet (v38r), built and not shipped, 2026-11-20

v38r_resnet50_california is the released v28's model, a ResNet-50 pretrained on SSL4EO-S12, trained on v38's corpus with v38's recipe (scripts/run_resnet_local.sh). On Santa Clara County it beats both: at 0.95 its pixel precision is 0.619 against v38's 0.615 and it finds 1,134 of 1,692 mapped arrays of 400 m² and up against 854 (rooftop 202 against 124 of 448, ground 914 against 712 of 1,217); against v5 at v5's best precision, 0.553, it finds 890 of the 1,254 installations of 500 m² and up against 625, pixel IoU 0.411 against 0.274. The owner asked on 19 November for the page to move to it, and the national run was built (data/predictions_resnet_20261119/california).

It was not published. The OSM ground screen run on its rasters showed that it misses much of the state's largest parks, which Santa Clara does not contain. Median share of each mapped park outline (imaged) the model detects:

Mapped parks by size Parks TerraMind v38 at 0.95 ResNet v38r at 0.95 v38r at 0.1
0.05 to 0.3 km² 259 0.958 0.970 0.992
0.3 to 1 km² 170 0.981 0.811 0.945
1 to 3 km² 52 0.973 0.828 0.936
3 to 30 km² 48 0.967 0.375 0.573

Over the 48 parks above 3 km² (307 km² mapped) it detects 140 km² against v38's 276; 95 of the 270 parks above 0.3 km² are less than half detected, against 20. Whole blocks of a park stay empty. It is not the threshold (at 0.1 it detects 181 km²) and not the inference window (one whole 0.1° cell at once gives the same). The page stays on v38 (owner, 2026-11-20). Verified would not have moved, since the published OSM screen is kept, but Best would have fallen to 30,812.5 MWp, with 34 outlines above the cap and 429 large leads left to judge after the published verdicts were carried over by overlap. Denmark's localized ResNet detects Denmark's parks as fully as its TerraMind did, and Texas's within 6% of the area, so both shipped (Denmark, Texas).

A size hybrid, 2026-11-20

The owner asked whether the two could be combined, the ResNet for its small arrays and the TerraMind for the large parks. scripts/build_hybrid_prob.py wrote a third run (data/predictions_hybrid_20261120): the ResNet's probability everywhere, and the higher of the two inside each of the TerraMind's 246 outlines of 0.3 km² and up (546 km²), the size where the ResNet starts to lose. The published pipeline then ran on it, with the owner's verdicts carried over by overlap as for the ResNet run (results/california_hybrid/):

TerraMind v38 (published) ResNet v38r Hybrid
Best (MWp) 32,198.9 30,812.5 32,220.9
Verified (MWp) 27,118.1 27,118.1 27,118.1
Mapped parks above 0.3 km², area detected 437 km² 257 km² 383 km²
of the 270 such parks, less than half detected 20 95 45
Santa Clara: mapped arrays of 400 m² and up found (of 1,692) 854 1,134 1,134
Unmapped outlines up to 0.1 km², expected real 1,177 2,207 2,079
Left to judge, above the cap and large leads 0 and 28 unsure 34 and 429 21 and 422

"Expected real" sums the calibration table's P(real) over the outlines, and P(real) is the share of each size bin that is mapped, so read it as a rough count. No TerraMind outline of 0.3 km² and up reaches the Santa Clara cells, so on the holdout the hybrid is the ResNet. It recovers most of the large parks, not all: where the TerraMind's own outline of a park is in pieces below 0.3 km², the park stays the ResNet's. Best is the TerraMind page's, because the extra arrays the ResNet finds sit in cells whose Best is already floored at the mapped capacity. The gain is about 900 more likely real unmapped arrays, mostly of 400 m² to 1 ha, as mapping leads; the cost is 443 outlines to judge again and a second model in the pipeline. The page stays on v38, and the hybrid is documented as an option (Pretrained model). It would not suit Texas: of the TerraMind's outlines of 0.3 km² and up that the owner judged there, 480 of 524 were not solar.

Checked against EIA's plants

EIA-860M lists California's plants with coordinates, so the same three checks as in Texas could be run:

  • The land constant. Ground capacity is mapped site area times 0.05 kWp/m², measured on parks in Pakistan, India and South Africa. In the 305 dissolved OSM ground outlines that hold an EIA-860M PV plant reporting panel capacity for every generator (12,580.6 MW DC on 290.2 km²), the mapped site holds 0.043 kWp/m² pooled, 0.047 median (interquartile 0.038 to 0.061). The constant reads a little high in California, by up to about 15% pooled, so the hand-mapped parks may be counted somewhat high; the pooled figure is itself a low reading wherever a plant's EIA point falls outside the outline that holds its panels.
  • What OSM covers. 79% of EIA's utility-scale PV capacity (AC) has an OSM ground outline within 2 km of its plant point (63% within 500 m); most of the rest went into operation from 2023 on. 90.5% of it lies in imaged cells.
  • What OSM has that EIA does not. 49 mapped ground outlines of 5 ha and up, 38.8 km² (1.9 GWp at the land constant), lie more than 2 km from any plant EIA lists as operating in September 2026; the largest, 11.9 km², is 7 km from the nearest. They are not phantoms: the model finds panels over 83% of their area in the May to September imagery. They are probably newer than EIA's inventory, or EIA places them elsewhere. The rest of the outlines that far from an EIA plant are small (11.3 km² in outlines below 5 ha), as expected of systems below EIA's 1 MW floor.

Plausibility gate

earthpv check-density fails 21 counties and flags 29 as suspect of the 57 on the page, all on the ground-mounted to rooftop ratio and the share of one cell. The same pattern as Texas, Denmark and Italy: the model sees almost no rooftop arrays, so the denominator is tiny, and a county with one large park has most of its capacity in one cell. The review of 18 November added three such fails (18 before), each a park judged solar that now holds much of its county: Alameda's and Contra Costa's lie on EIA plants (Aramis I, 100 MW; P66 Rodeo, 30 MW), while Placer's three outlines (2.8 km² west of Roseville) have no EIA solar plant within 10 km. The model's unmapped outlines of 1 ha and up have now been judged by eye (below); the smaller ones have not, and the EIA comparison above is their only check.

What is counted

  • OpenStreetMap: 44,476 reference features inside the state's outline (42,034 of the bbox pull lie outside it), placed as 21,172 ground, 21,158 rooftop and 2,146 unknown; 6,254 of them are 400 m² and up and hold 26,850.4 MWp. Verified is all mapped capacity, almost all of it the ground outlines (506 km² dissolved); 24 outlines above 5 km² (223.1 km²) are kept because the ground screen finds them imaged and at least half detected.
  • Solar thermal: five concentrated solar power plants count at their tagged rating, 922.0 MW: Mojave Solar (280), Genesis (250) and Ivanpah 1 to 3 (126, 133, 133). EIA-860M lists the same seven generators at 922.8 MW nameplate (917.8 MW net summer). No PV outline lies inside a plant's mirror field.
  • Model: 5,308 candidates. Best adds 5,080.8 MWp over Verified: in 596 cells the model's priced figure fell below the mapped capacity and Best is floored at Verified. Of the 188 outlines above the 100,000 m² merge cap (35.5% of candidate area), the 70 judged solar count whole; the other 118 (22.9%, the largest 19.5 km²) stay out of capacity, 54 judged not solar and 64 never on the review page (near mapped solar, or left out by the lead screens). 217 OSM-verified oversize candidates (348.0 km²) are exempt. 37 priced candidates, 7.4 MWp, lie beyond the state's outline in cells kept whole.
  • Judged by a person (the owner, 18 November 2026, on the two disk review pages): all 124 outlines above the cap (94.0 km²). 70 are parks, 79.5 km², and each counts whole as ground, led by Kern (23, 32.6 km²) and Riverside (11, 26.1 km²); 54 are not. 28 of the 29 blobs within 500 m of an EIA-860M solar plant were judged parks, against 42 of the 95 elsewhere. Of the 1,176 leads from 1 ha up to the cap (29.7 km²), 1,148 are judged: 823 solar (19.91 km² of outline, 18.65 km² credited, roofs at ½.5; 86 of 98 judged roof leads) and 325 not (9.29 km², 11 of them bright roofs), which now count nothing; 28 left unsure keep their size bin's price.
  • Mapping leads and polygons: 3,368 leads and 124 blobs in release pv-new-leads-2026-11-02, and every model outline (5,270) with the 44,481 OSM features in pv-polygons-2026-11-11, both linked from the page's Downloads.
  • Footprints: VIDA, with OSM buildings filling its empty 0.01° blocks across the California and Texas boxes (see Texas). data/vida/USA.parquet holds those two states only.

What California needs next

The parks judged solar, mapped. Mapping the 70 parks the review admitted in OpenStreetMap would move them from Best into Verified; 28 large leads were left unsure and wait on the review page.

A rooftop instrument. Areas mapped panel by panel would start a small-installation half for the 21.2 GW EIA estimates on small systems, the largest gap of any atlas so far.

The steps still owed. Look at a sample of the model's unmapped ground outlines on high-resolution imagery, and propose calibration areas.

Reproducing

California follows Scale to a new country, with the AOI in configs/aoi.yaml (division: {subtype: region, iso3: USA}) and the model in configs/terramind_pv_v38_california.yaml. The last step:

pixi run earthpv atlas --aoi california \
  --osm-solar data/labels/california_national_osm_solar.parquet --include-offgrid-osm \
  --imagery-date-range "May - Sep 2026" --out results/california_pv_evidence_atlas.html