Skip to content

Texas: the solar parks, mapped and priced by area

Texas was added on the owner's request on 10 November 2026, with California and Mexico, as the first state run as an AOI of its own (division.subtype: region): its regions are its 254 counties, and the hand-mapped solar is clipped to the state's own outline rather than the country's. Otherwise it follows the rules every recent country follows: no calibration quadrats, no register used to calibrate, the segmentation localized on Texas's own OpenStreetMap labels and shipped only if it beats the general model on a held-out region. It ties on recall and wins on pixel IoU. Since 20 November 2026 this page runs on v39r_resnet50_texas, a ResNet-50 localized the same way, which found more of the held-out installations than the TerraMind v39_combined_texas it replaced (below).

Interactive: Texas under Countries.

Headline

Verified 45,712.0 MWp (90% 31,832 to 66,151)
Best estimate 51,488.0 MWp (90% 43,229 to 70,405)
Generation 79.8 TWh/yr from Best (90% 67.0 to 109.2), 1,551 kWh/kWp
Grid 1,863 imaged cells of 0.1°, of the 6,077 that cover the state; 239 of its 254 counties hold an imaged cell
Imagery Sentinel-2 L2A, May to September 2026, median scene 7 August
Model v39r_resnet50_texas epoch 18 at threshold 0.3, a localized ResNet-50 (see below)

A map of the parks, in panel capacity

Texas has no calibration quadrats, so there is no roofclf half and no instrument below the 400 m² segmentation floor, and recall was not corrected (--recall-reference none). Best is 51,314.5 MWp ground and 173.5 MWp rooftop: the rooftop systems the U.S. Energy Information Administration estimates at 3,529.6 MW are almost all missing. EIA counts 37,200.5 MW of solar PV in Texas at the end of August 2026, 33,670.9 MW of it utility-scale (Electric Power Monthly, table 6.2.B), and its generator inventory lists 34,978.8 MW of utility-scale PV in 251 plants at the end of September (EIA-860M). Those are inverter (AC) figures; this page counts panels (DC), and where EIA-860M reports both, Texas's plants carry 1.29 times as much panel as inverter capacity, about 45 GW DC for the utility-scale fleet. Read Best's 138% of EIA's total with that in mind, and with the parks EIA does not list (below).

The page compares the state total with both EIA figures, and the counties with EIA-860M's utility-scale plants summed by county (101 counties; Yoakum County's 300 MW lies in a cell that was not imaged). Over those 101 counties Best and EIA rank the counties at Spearman 0.79, and Best is 0.9 to 1.8 times EIA's AC figure in the ten counties with the most capacity, 0.7 to 1.4 in DC terms. None of these figures is ground truth for this map. Ember's customs data are national, so this page has no import ceiling.

Localizing the detector

The holdout is Bexar County: 32 cells, 54 of the state's 655 dissolved positives of 400 m² and up (8.2%), chosen by pick_val_region.py from the label map before training; the largest county, Travis, is never the holdout. pick_checkpoint_by_recall.py kept the val/mIoU pick, epoch 36 at threshold 0.3: the holdout has too few installations of 400 m² and up to choose among epochs on recall (324 and 44 on its two halves, 50 each needed).

Compared at equal pixel precision (0.91) Local v39 epoch 36 General v5
Recall, installations of 500 m² and up (of 355) 0.851 0.845
of 1,000 m² and up (of 320) 0.944 0.931
of 500 to 1,000 m² (of 35) 0.000 0.086
Pixel IoU 0.816 0.761
Pixel F1 0.899 0.865

Recall ties (302 against 300 of 355) and the local model wins on pixel IoU by 0.055, so it ships under the tie rule. Neither finds arrays below 1,000 m² in Bexar County at this precision.

The localized ResNet (v39r), 2026-11-20

v39r_resnet50_texas is the released v28's model, a ResNet-50 pretrained on SSL4EO-S12, trained on v39's corpus with v39's recipe, so the architecture is the only difference (scripts/run_resnet_local.sh, configs/terramind_pv_v39r_resnet50_texas.yaml). Epoch 18 was kept. On the same Bexar County holdout, at the threshold both ship at:

At threshold 0.3 ResNet v39r TerraMind v39
Pixel precision 0.929 0.906
Pixel recall 0.914 0.891
Mapped arrays of 400 m² and up found (of 368) 329 302
rooftop, 400 to 5,000 m² (of 21) 7 6
ground, 400 m² and up (of 343) 318 292

It finds 27 arrays the TerraMind misses and misses none it finds (results/fair_score/resnet_local/texas/). Against the general v5, both at pixel precision 0.93 or more, it finds 320 of the 355 installations of 500 m² and up against 298, pixel IoU 0.854 against 0.751 (results/texas_checkpoint_decision.json).

Bexar County holds few large parks, and California's localized ResNet, which won its own holdout too, misses much of that state's largest parks (California). So Texas's was also checked on the parks mapped across the state, with the OSM ground screen run on its rasters: over the 119 mapped parks above 3 km² (814 km²) it detects 726 km² against v39's 777 (median share of each outline 0.944 against 0.978), and 10 of the 204 parks above 0.3 km² are less than half detected, against 2; smaller parks are detected equally. That is a small loss beside its gains, and it draws far fewer large false outlines: 3,188 outlines against 7,560, 398 above the cap against 1,109. The owner asked on 19 November for the page to move to it. Best moved from 52,249.8 to 51,488.0 MWp, and Verified, which is the map, did not move: the page keeps the OSM ground screen run on v39's rasters.

Checked against EIA's plants

Texas's plants are in a public inventory with coordinates, so three things could be checked that no other atlas can check this way:

  • The land constant. Ground capacity is mapped site area times 0.05 kWp/m², measured on parks in Pakistan, India and South Africa. In the 86 OSM outlines that hold an EIA-860M plant reporting panel capacity for every generator (15,536 MW DC on 330.3 km²), the mapped site holds 0.047 kWp/m² pooled, 0.048 median (interquartile 0.041 to 0.056). The constant holds in Texas, though a single park can differ from it either way.
  • What OSM covers. 72% of EIA's utility-scale AC capacity has an OSM ground outline within 2 km of its plant point (62% within 500 m); most of the rest went into operation in 2024 to
  • 84.6% of it lies in imaged cells.
  • What OSM has that EIA does not. 168 km² of mapped ground outlines (8.4 GWp at the land constant) lie more than 2 km from any plant EIA lists as operating in September 2026, 160 km² of it in 32 outlines above 1 km². They are not phantoms: the TerraMind run (v39), whose OSM ground screen the page keeps, finds panels over 97% of their area in the May to September imagery. They are probably newer than EIA's inventory, or EIA places them elsewhere. About 1.8 GWp of Verified lies in four counties with no operating plant in EIA-860M (Matagorda, Crockett, Callahan, Garza).

Plausibility gate

earthpv check-density fails 72 counties and flags 74 as suspect of the 239 on the page (71 and 104 under v39), all on the ground-mounted to rooftop ratio and the share of one cell. The same pattern as Denmark and Italy: the model sees almost no rooftop arrays, so the denominator is tiny, and a county with one large park has most of its capacity in one cell. Under v39, the review of 18 November added eight such fails (63 before), each a park judged solar that then held most of its county. Of the ResNet run's unmapped outlines of 1 ha and up, the verdicts carried over from that review settle 347 of 744 (below); the smaller ones have not been judged, and the EIA comparison above is their only check.

What is counted

  • OpenStreetMap: 12,948 reference features inside the state's outline (19,730 of the bbox pull lie outside it), placed as 10,818 rooftop, 1,016 ground and 1,114 unknown; 666 of them are 400 m² and up and hold 45,651.3 MWp. Verified is all mapped capacity, almost all of it the 1,016 ground outlines (912 km²).
  • Model: 3,188 candidates (7,560 under v39); none lies inside a mapped solar-thermal outline. Best adds 5,776.0 MWp over Verified: in 240 cells the model's priced figure fell below the mapped capacity and Best is floored at Verified. Of the 398 outlines above the 100,000 m² merge cap (29.5% of candidate area, the largest 8.14 km²), the 63 judged solar count whole; the other 335 stay out of capacity, 94 judged not solar, 93 not judged yet and 148 never on the review page (near mapped solar, or left out by the lead screens). 198 OSM-verified oversize candidates (864.8 km²) are exempt. 106 priced candidates, 114.1 MWp, lie beyond the state's outline in cells kept whole.
  • Judged by a person (the owner, 18 November 2026, on the v39 run's two disk review pages, carried over to the ResNet run on 20 November): an outline of the new run takes a verdict when at least half of it lies inside outlines the owner judged solar, or not solar (scripts/carry_review_verdicts.py). Of its 250 outlines above the cap, 63 are parks, 107.6 km², and each counts whole as ground; 94 are not (42.0 km², 1 bright roof), and 93 (28.9 km²) are outlines nobody judged, which count nothing until they are. Of its 494 leads from 1 ha up to the cap, 48 are solar (1.61 km² of outline) and 142 not (5.8 km²); 304 (11.2 km²) wait and keep their size bin's price. The owner had judged 841 of v39's 845 outlines above the cap (51 parks, 122.9 km²; 790 not) and 842 of its 875 large leads (83 solar, 759 not). In that review, against EIA-860M, 19 of the 21 blobs within 500 m of a solar plant were judged parks, against 32 of the 824 elsewhere; 17 of the parks (42.4 km², about 2.1 GWp) lie more than 5 km from any plant EIA lists, like the mapped outlines EIA lacks (above).
  • Mapping leads: 1,559 leads and 93 outlines above the cap, none checked, and the 111 outlines judged solar that mappers get, in release pv-new-leads-2026-11-02, linked from the page's Downloads.
  • Solar thermal: none counted. EIA lists no solar thermal capacity in Texas, the OSM scan (read from the Geofabrik extract of 11 November, since Overpass refused the area scan) finds no concentrated solar power plant, and 4 heating plants without electric output are not counted.
  • Footprints: VIDA, with 26,674 OSM buildings filling 6,013 empty 0.01° blocks across the California and Texas boxes (0.09% of 30.2 million). data/vida/USA.parquet holds those two states only.

What Texas needs next

The parks judged solar, mapped. Mapping the 63 parks judged solar in OpenStreetMap would move them from Best into Verified.

The new outlines judged. 93 outlines above the cap and 304 large leads of the ResNet run wait on the review pages.

A rooftop instrument. Areas mapped panel by panel would start a small-installation half for the 3.5 GW EIA estimates on rooftops.

The steps still owed. Look at a sample of the model's unmapped ground outlines on high-resolution imagery, and propose calibration areas.

Reproducing

Texas follows Scale to a new country, with the AOI in configs/aoi.yaml (division: {subtype: region, iso3: USA}) and the model in configs/terramind_pv_v39r_resnet50_texas.yaml (the TerraMind it replaced: configs/terramind_pv_v39_texas.yaml). The run is in data/predictions_resnet_20261119/ (release_leads.py SOURCES). The last step:

pixi run earthpv atlas --aoi texas --pred-dir data/predictions_resnet_20261119 \
  --osm-solar data/labels/texas_national_osm_solar.parquet --include-offgrid-osm \
  --imagery-date-range "May - Sep 2026" --out results/texas_pv_evidence_atlas.html